Skip to main content
AskVantage

311 Institute report · October 2026

The Future of Data and Energy Transmission 2050

What will carry the world's power and data to 2050, and who will control it?

A map of power and data transmission worldwide, today and to 2050. It covers every region and the technologies, patents, labs, standards, investment and big bets, with 139 sized predictions and their warning signs.

406 pages · 765 sources, each dated and tiered · 139 sized predictions to 2050

The Future of Data and Energy Transmission 2050 report cover
By the 311 Strategic Intelligence Unit

What is the future of data and energy transmission?

One system, limited by power, not bandwidth. AI is pulling together two networks built apart for a century, one for electricity and one for data. AI data centres need gigawatts that grids cannot connect quickly, so compute moves to wherever power can be found and fibre carries the results back. The winners will be those who control the slowest assets to build.

The shortages are physical, not financial: grid connections, power transformers, high-voltage cable factory slots, cable repair ships and, until about 2028, optical fibre. Money is not short. We see three stages to 2050: a squeeze to 2030, a re-plan from 2030 to 2040 as compute follows firm, clean power, and from 2040 power and data networks planned together by default.

By the 311 Strategic Intelligence Unit, ·

Key facts

  • $550bnspent on the world's grids each year today. Report, p. 9
  • $720bn+planned 2026 spending by the four biggest cloud builders ($720bn to $740bn). Report, p. 9
  • RMB 5tn+of grid investment China plans for 2026 to 2030. Report, p. 9
  • 415 TWhused by data centres in 2024, on IEA figures. Report, p. 37
  • 6.4 Pbpsof international bandwidth in 2024, heading for 40 to 80 Pbps by 2035. Report, p. 9
  • 139sized predictions to 2050, each with a probability and a warning sign. Report, p. 319

Bandwidth is plentiful. Power is scarce.

The usual view is that AI needs more bandwidth, so the future of transmission is faster fibre, more subsea cables and more satellites.

Our view is that bandwidth is plentiful. Power, grid connections, equipment, ships and rights of way are scarce. So power and data networks are being re-planned as one system, and the winners will be those who control the slowest assets to build.

850+TWh used by data centres in 2030: 850 to 1,050 TWh (65 to 75% likely), from 415 TWh in 2024
5-9%of world electricity used by data centres by 2050: 2,500 to 4,500 TWh (40 to 50% likely)
$650bn+World grid spending a year by 2035 ($650bn to $850bn), from about $550bn today
40-80Pbps of international bandwidth by 2035, up from 6.4 Pbps in 2024

What will change in power and data transmission to 2050?

01

Electricity, not bandwidth, now limits growth.

AI data centres need gigawatts that grids cannot connect quickly. Compute is moving to wherever power can be found, and fibre carries the results back. Japan calls this Watt-Bit planning, and the US has a Speed to Power drive.

02

The shortages are physical, not financial.

Grid connections, power transformers, high-voltage cable factory slots, cable repair ships and, until about 2028, optical fibre are all short. Money is not: equipment makers have record order books.

03

Every region answers in its own way.

China plans power and data together from the centre. The US connects big new loads on flexible terms. Europe rations grid connections while it builds links between countries. The Gulf must protect its sites, and Africa's bottleneck has moved inland.

04

The winners to 2035 are practical, not glamorous.

HVDC lines, higher-capacity wire on old towers, line sensors, grid-forming inverters, co-packaged optics and laser-linked satellites lead. Meshed DC grids, hollow-core fibre and superconducting cable matter more after 2035.

05

The cable is being designed out.

Inside AI racks, circuit boards, light inside the chip package and 800-volt power replace copper. Over long distances, private power plants, satellites and data centres beside wind farms bypass new lines. Chinese firms are challengers in nearly every case.

How was the report researched?

Evidence in many languages.

Regulators, grid operators, company filings, standards bodies, patent databases, research papers and specialist press, in English, Chinese, Japanese, Korean, Russian, Portuguese, Spanish, Arabic and other languages, retrieved between 27 and 29 October 2026.

139 predictions you can score.

Each call has a probability, a horizon (to 2030, 2030 to 2040 or 2040 to 2050) and an early warning sign, and the strongest case against our view is set out in full.

Every figure traced.

765 numbered sources, each dated and graded primary, corroborated or single-source. Patents were counted from public databases, and a separate check re-tested a random sample of 40 claims against their sources before publication.

Five calls you can hold us to.

The report carries 139 sized predictions. Each has a date, a probability and a warning sign, so readers can see early which way things are breaking.

  1. By 202860 to 70% confidence

    At least one government budgets for a new dedicated cable-repair ship by the end of 2028.

    Why we think soAbout $3bn is needed for 20 ships, and Red Sea repairs took five months in 2024.

    Early warning signA NATO, US, Japanese or Taiwanese budget line for repair ships.

  2. By 202845 to 55% confidence

    A superconducting power system of 10 MW or more serves a named AI data-centre campus by the end of 2028.

    Why we think soVEIR sent 3 MW through one cable in 2025 and has raised $225m. KEPCO and LS plan one in Korea by 2028.

    Early warning signVEIR or LS names a first commercial customer with a stated capacity.

  3. By 203065 to 75% confidence

    Global data-centre electricity use lands between 850 and 1,050 TWh in 2030.

    Why we think soThe IEA base case is about 945 to 950 TWh, from 415 TWh in 2024.

    Early warning signGrowth below 12% a year in 2027 points to the low end.

  4. By 203070 to 80% confidence

    China commissions at least 13 of its 15 targeted new UHV DC corridors by the end of 2030.

    Why we think soAn NEA target, backed by State Grid's RMB 4 trillion (about $563bn) plan for 2026 to 2030.

    Early warning signFewer than five of the 15 in service by the end of 2028.

  5. By 203245 to 55% confidence

    Outside China, a multi-terminal HVDC system with two vendors' converters enters service by the end of 2032.

    Why we think soChina has run a four-terminal ring since 2020, but the EU's InterOPERA demonstrator runs only to April 2027.

    Early warning signA European grid operator awarding a multi-vendor HVDC deal by 2029.

What is inside the report?

Parts I and II set out the global system today and to 2050. Parts III to XIII go region by region, including the oceans and space. Parts XIV to XX cover technologies, competitors and the big bets, and Parts XXI to XXIV the strategy and the prediction register.

01

The global system today

What carries the world's power and data in 2026, who pays and where it pinches.

02

The global view to 2050

Demand, grid spending and bandwidth, with ten headline calls.

03

The Americas

North America, Latin America and the Caribbean.

04

Europe, Russia and Central Asia

Grid rationing, offshore grids, the Caucasus and the Caspian.

05

The Middle East and Africa

The Gulf, North Africa and Sub-Saharan Africa.

06

Asia and Oceania

China and Hong Kong, East Asia, South Asia, Southeast Asia and Oceania.

07

The global commons

Subsea cables, repair ships, satellites and space.

08

Technologies and competitors

Technology outlook, disruptors, patents, labs, standards, investment and the big bets.

09

Strategy and predictions

Hidden activity, twelve plays, what would prove us wrong and the 139-call register.

Book Matthew Griffin to brief your leaders on the future of power and data.

Matthew turns the findings into a clear session about your markets, your competitors and the networks your organisation depends on, then helps your leaders decide what to do next.

01

Keynote

Give leaders, teams or event audiences a clear, evidence-based view of how power and data networks are becoming one system.

02

Executive briefing

Give your board a private session on the bottlenecks, the regions, the disruptors and the bets that matter to you.

03

Leadership workshop

Test your plans against the twelve plays, the kill tests and the warning signs, and decide which to act on first.

Every session is built around your audience and what they need to know.

Tell us who the session is for and what you want it to achieve. We will suggest the right format.

Data and energy transmission, answered

What is the future of data and energy transmission?+

Power and data networks are turning into one system, and electricity, not bandwidth, now limits growth. AI data centres need gigawatts that grids cannot connect quickly, so compute moves to wherever power can be found and fibre carries the results back. The winners will be those who control the slowest assets to build: grid connections, converter sites, factories, ships and rights of way.

Will AI data centres run out of power?+

Power, not money, is the main limit today. Grid connections, power transformers, high-voltage cable factory slots and cable repair ships are all in short supply, while the four biggest cloud builders plan to spend about $720bn to $740bn in 2026. So compute is moving to wherever power can be found. In the US, big new loads connect on flexible terms: data centres bring their own power and accept being cut off in an emergency.

How much electricity will data centres use by 2030 and 2050?+

We expect data centres to use 850 to 1,050 TWh of electricity in 2030 (65 to 75% likely), up from about 415 TWh in 2024 on IEA figures. By 2050 we expect 2,500 to 4,500 TWh, or 5 to 9% of world electricity demand (40 to 50% likely).

How much is the world spending on power grids?+

The world spends about $550bn a year on grids, and we expect $650bn to $850bn a year by 2035. China alone plans more than RMB 5 trillion of grid investment for 2026 to 2030, and India is building one of the world's largest transmission programmes.

Which transmission technologies will win by 2035?+

The likely winners are practical, not glamorous: UHV and HVDC lines that move bulk power long distances, higher-capacity wire on old towers, dynamic line rating, grid-forming inverters, co-packaged optics and optical chip links in AI systems, and satellite networks linked by lasers. Each is already made in factories and has big buyers paying for it.

What is HVDC and why does it matter?+

HVDC (high-voltage direct current) lines move large amounts of power over long distances with low losses. They are already mainstream in China, which plans about 15 new UHV DC channels by 2030. We rate UHV and HVDC corridors at over 90% likely to be mainstream by 2035 and over 95% by 2050.

What could disrupt cable makers and grid incumbents?+

The biggest threat is the cable being designed out, not a better cable. Inside AI racks, circuit boards, light inside the chip package and 800-volt power are replacing copper cables. Over long distances, AI campuses with their own power plants, satellites that talk straight to phones and data centres beside wind farms bypass new lines.

Is China ahead in power and data transmission?+

China funds the whole chain and plans power and data together from the centre. It files most patents in HVDC, superconducting cable, subsea repeaters and quantum communication, sets world prices for fibre and already leads in the optical modules that AI data centres buy. Its share is lowest in power beaming and in co-packaged optics and silicon photonics.

What would prove this report wrong?+

The case against us is serious on timing and scale, but weak on direction. Grid queues may overstate real demand, efficiency could outrun demand, or AI spending could stall. The report sets out the strongest counter-case and a dated list of checks, including capex guidance in early 2027 and fibre prices by the end of 2028.

Can Matthew present the findings?+

Yes. The research can be turned into a keynote, board briefing or leadership workshop on the future of power and data networks, built around your audience, your markets and your plans.

Using these findings?

You are welcome to quote the findings with a link to this page. Please cite the report as:

Free to quote with credit and a link. Please ask before republishing whole sections, more than three charts or the PDF itself. How to use our research.

311 Strategic Intelligence Unit (2026). The Future of Data and Energy Transmission 2050. 311 Institute. https://www.311institute.com/future-of-data-and-energy-transmission-2050/

See the full picture.

Download the complete 406-page report, The Future of Data and Energy Transmission 2050, with every source dated and tiered.

Download the report (PDF, 7.7 MB)